Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 21, 2021, 08:39 AM
  • H 0727A_H 0727_07212021_015144.mp4

Date
07/21/2021
W/O
901521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00941
PipeID
P11137
Time
1:39 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8698
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
LA PUENTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_901521_TV22077_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
28 in.
Width
28 in.
Upstream MH
H 0727A
Downstream MH
H 0727
Dir. of Survey
Downstream
Length Surveyed
252.2 ft.
Total Length
252.2 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
245
O&M Index
2
O&M Quick
412I
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
349
Pipe schematic from manhole H 0727A to H 0727
MH: H 0727AMH: H 0727downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 0727A0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.4 ft. MGO - General Observation - 65% MAG COAT4.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start249.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish250 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish252.2 ft. AMH - Downstream Manhole, Survey Ends - H 0727

Observation photos (3)

  • General Observation - 65% MAG COAT

    4.4 ft. - General Observation - 65% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
250DAGS
4.4MGO65% MAG COAT
0MWL
250SSS
4.4SSS
249.9SAV
4.4SAV
2DAGS
0AMHH 0727A
252.2AMHH 0727
0MWM

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING, MAG COAT
custom_field_two
3
customer
1
datetime
2021-07-21T01:39:49-07:00
documentation
PRO PIPE
is_lateral_inspection
false