Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2021, 08:56 AM
  • 14 0382_14 0381A_08112021_020339.mp4

Date
08/11/2021
W/O
896585
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18462
Time
1:56 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9228
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_896585_TV14025_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0381A
Downstream MH
14 0382
Dir. of Survey
Upstream
Length Surveyed
34.9 ft.
Total Length
34.9 ft.
Structural Index
3
Structural Quick
3727
Structural Rating
35
O&M Index
5
O&M Quick
5141
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
44
Pipe schematic from manhole 14 0381A to 14 0382
MH: 14 0381AMH: 14 0382upstream0 ft. MSA - Survey Abandoned - DUE TO DEBRIS. REVERSAL COMPLETE.0 ft. DSZ - Deposits Settled Other, 50 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES - DEBRIS0 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish8.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"31.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"32.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start32.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start34.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK34.9 ft. MWL - Water Level, 40 %of cross sectional area34.9 ft. AMH - Downstream Manhole, Survey Begins - 14 0381A34.9 ft. MWM - Water Mark, 50 %of cross sectional area34.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Survey Abandoned - DUE TO DEBRIS. REVERSAL COMPLETE.

    34.9 ft. - Survey Abandoned - DUE TO DEBRIS. REVERSAL COMPLETE.

  • Deposits Settled Other,  50 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES - DEBRIS

    34.9 ft. - Deposits Settled Other, 50 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES - DEBRIS

Observations (13)

DistanceCodeObservation
26.1TFC
34.9MSADUE TO DEBRIS. REVERSAL COMPLETE.
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
0AMH14 0381A
0MWM
2SAP
0MGOCOCKROACHES IN MANHOLE
3TFC
34.9DSZDEBRIS
34.9SSS
34.9SAP
2SSS

Properties (7)

additional_info
630069081021201
custom_field_three
ABANDONED DUE TO DEBRIS
custom_field_two
5
customer
1
datetime
2021-08-11T01:56:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false