Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 7, 2021, 08:51 AM
  • 14 0401_14 0400_07072021_015806.mp4

Date
07/07/2021
W/O
896585
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18483
Time
1:51 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9023
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_896585_TV14025_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0401
Downstream MH
14 0400
Dir. of Survey
Downstream
Length Surveyed
103 ft.
Total Length
103 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
100
O&M Index
2
O&M Quick
412C
O&M Rating
44
Overall Index
2
Overall Quick
Overall Rating
144
Pipe schematic from manhole 14 0401 to 14 0400
MH: 14 0401MH: 14 0400downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start0 ft. AMH - Upstream Manhole, Survey Begins - 20 04010 ft. MWL - Water Level, 30 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start16.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"25.1 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"41 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"64.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish100.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish100.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish103 ft. MGO - General Observation - COCKROACHES IN MANHOLE103 ft. AMH - Downstream Manhole, Survey Ends - 14 0400

Observation photos (1)

  • General Observation - COCKROACHES IN MANHOLE

    103 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
100.7SAP
16.6TFC
0MGOCONNECTION AT MH 3 O'CLOCK
0MWM
100.7DAGS
2SAP
2SSS
25.1TBA
0DAGS
89.1TFC
103MGOCOCKROACHES IN MANHOLE
41TFC
64.5TFC
100.7SSS
0AMH20 0401
103AMH14 0400
0MWL

Properties (7)

additional_info
630069070621202
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-07-07T01:51:09-07:00
documentation
PRO PIPE
is_lateral_inspection
false