Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 7, 2021, 08:58 AM
  • 14 0400_14 0399_07072021_020803.mp4

Date
07/07/2021
W/O
896585
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18482
Time
1:58 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9023
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_896585_TV14025_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0400
Downstream MH
14 0399
Dir. of Survey
Downstream
Length Surveyed
155.5 ft.
Total Length
155.5 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
150
O&M Index
2
O&M Quick
412E
O&M Rating
64
Overall Index
2
Overall Quick
Overall Rating
214
Pipe schematic from manhole 14 0400 to 14 0399
MH: 14 0400MH: 14 0399downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04000 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start10.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"34.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"62.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"87 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"110.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"135.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"153.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish153.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish153.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish155.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE155.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0399

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    155.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (19)

DistanceCodeObservation
0AMH14 0400
2DAGS
135.4TFC
2SSS
0MWL
10.1TFC
155.5MGOCOCKROACHES IN MANHOLE
87TFC
34.1TFC
62.2TFC
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
2SAP
0MGOCOCKROACHES IN MANHOLE
110.7TFC
153.6SSS
153.6SAP
153.6DAGS
155.5AMH14 0399

Properties (7)

additional_info
630069070621202
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-07-07T01:58:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false