Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2014, 11:26 AM
  • 14 0337_14 0759_09122014_034632.mp4

Date
12/09/2014
W/O
476827
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P20642
Time
3:26 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K1921
Sewer Name
14 TRUNK "F"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
10
Purpose
Routine Assessment
Project
WO_476827_TV14027_2014NOVEMBER
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
14 0337
Downstream MH
14 0759
Dir. of Survey
Downstream
Length Surveyed
340.7 ft.
Total Length
340.7 ft.
Structural Index
3
Structural Quick
3M2D
Structural Rating
256
O&M Index
2
O&M Quick
2D11
O&M Rating
47
Overall Index
3
Overall Quick
Overall Rating
303
Pipe schematic from manhole 14 0337 to 14 0759
MH: 14 0337MH: 14 0759downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 03370 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start16.2 ft. OBM - Obstacles Pipe Material, 5 %of cross sectional area, from 06 to 08 o'clock18.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"68 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish91.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"138.9 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start168.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"241.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"246.7 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish266.1 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start324.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"334.7 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish340 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish340.7 ft. AMH - Downstream Manhole, Survey Ends - 14 0759340.7 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - AT MH340.7 ft. MGO - General Observation - CAPPED CONNECTION AT MH 3 O'CLOCK

Observation photos (16)

  • Upstream Manhole, Survey Begins - 14 0337

    0 ft. - Upstream Manhole, Survey Begins - 14 0337

  • Water Level, 15 %of cross sectional area

    0 ft. - Water Level, 15 %of cross sectional area

  • Water Mark, 40 %of cross sectional area

    0 ft. - Water Mark, 40 %of cross sectional area

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    10.2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Pipe Material, 5 %of cross sectional area, from 06 to 08 o'clock

    16.2 ft. - Obstacles Pipe Material, 5 %of cross sectional area, from 06 to 08 o'clock

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    18.8 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    91.3 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Settled Fine,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    138.9 ft. - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    168.7 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    241.7 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    266.1 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    324.8 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Downstream Manhole, Survey Ends - 14 0759

    340.7 ft. - Downstream Manhole, Survey Ends - 14 0759

  • Vermin Cockroach, within 8 inches of joint: YES - AT MH

    340.7 ft. - Vermin Cockroach, within 8 inches of joint: YES - AT MH

  • General Observation - CAPPED CONNECTION AT MH 3 O'CLOCK

    340.7 ft. - General Observation - CAPPED CONNECTION AT MH 3 O'CLOCK

Observations (20)

DistanceCodeObservation
0AMH14 0337
241.7TFA
266.1SSS
340.7AMH14 0759
168.7TFC
0MWL
138.9DSF
10.2SSS
18.8TFC
91.3TF
0MWM
2SAP
334.7SSS
340SAP
68SSS
246.7DSF
16.2OBM
340.7VCAT MH
324.8TFA
340.7MGOCAPPED CONNECTION AT MH 3 O'CLOCK

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2014-12-09T03:26:24-08:00
documentation
PRO PIPE
is_lateral_inspection
false