Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2014, 06:16 AM
  • 14 0323_14 0322A_08122014_222201.mp4

Date
12/08/2014
W/O
476827
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P20829
Time
10:16 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K1921
Sewer Name
14 TRUNK "F"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
WO_476827_TV14027_2014NOVEMBER
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
14 0323
Downstream MH
14 0322A
Dir. of Survey
Downstream
Length Surveyed
30.4 ft.
Total Length
30.4 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 14 0323 to 14 0322A
MH: 14 0323MH: 14 0322Adownstream0 ft. MGO - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - AT MH0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 14 03232.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish30.4 ft. MGO - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK30.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0322A

Observation photos (9)

  • General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK

    0 ft. - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK

  • Water Mark, 35 %of cross sectional area

    0 ft. - Water Mark, 35 %of cross sectional area

  • Vermin Cockroach, within 8 inches of joint: YES - AT MH

    0 ft. - Vermin Cockroach, within 8 inches of joint: YES - AT MH

  • Water Level, 25 %of cross sectional area

    0 ft. - Water Level, 25 %of cross sectional area

  • General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

    0 ft. - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

  • Upstream Manhole, Survey Begins - 14 0323

    0 ft. - Upstream Manhole, Survey Begins - 14 0323

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK

    30.4 ft. - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK

  • Downstream Manhole, Survey Ends - 14 0322A

    30.4 ft. - Downstream Manhole, Survey Ends - 14 0322A

Observations (10)

DistanceCodeObservation
0MGOCAPPED CONNECTION AT MH 9 O'CLOCK
30.4MGOCAPPED CONNECTION AT MH 9 O'CLOCK
0MWM
0VCAT MH
28.1SAV
0MWL
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH14 0323
30.4AMH14 0322A
2.1SAV

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2014-12-08T22:16:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false