Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 4, 2014, 12:02 PM
  • B 1496_B 1495_20141204_033138.mp4

Date
12/04/2014
W/O
475194
Weather
Light Rain
Operator/Surveyor
CORTEZ ESTEBAN
Sewer ID
Z01127
PipeID
P25485
Time
4:02 AM
Certificate
U-209-8148
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2012
Sewer Name
B JOINT OUTFALL B - UNIT 6H RELIEF
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
20
Purpose
Routine Assessment
Project
WO_475194_TV16086_2014NOVEMBER
Sewer Type
GRAVITY
Material
FRPP
Shape
Circular
Height
41 in.
Upstream MH
B 1496
Downstream MH
B 1495
Dir. of Survey
Downstream
Length Surveyed
394.5 ft.
Total Length
394.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole B 1496 to B 1495
MH: B 1496MH: B 1495downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 14960 ft. MWM - Water Mark, 20 %of cross sectional area5.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start30 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"343.4 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6" - Capped384.1 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"391.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish394.5 ft. AMH - Downstream Manhole, Survey Ends - B 1495

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    5.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    30 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6" - Capped

    343.4 ft. - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6" - Capped

  • Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    384.1 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Finish

    391.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

Observations (9)

DistanceCodeObservation
391.2DAGS
0MWL
384.1TB
343.4TBCCapped
0AMHB 1496
0MWM
30TFC
394.5AMHB 1495
5.9DAGS

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2014-12-04T04:02:10-08:00
documentation
PRO-PIPE
is_lateral_inspection
false
year_laid
20100114