02 1766_02 1765_8112021_024424.mp4
2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO, Start - FIBOROUS BLISTERING OUTER SURFACE
8.3 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - FIBOROUS OUTER SURFACE
19.8 ft. - Tap Break-In Defective, at 02 o'clock, -, , within 8 inches of joint: NO, 6" - Open 100% GREASE
68.3 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - FIBOROUS OUTER SURFACE
90.4 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCKS ,SOIL,SLUDGE
95.8 ft. - General Observation - ZOOM 26'
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 121.9 | AMH | 3:10AM |
| 0 | MWM | — |
| 68.3 | SSS | FIBOROUS OUTER SURFACE |
| 2 | SSS | FIBOROUS BLISTERING OUTER SURFACE |
| 90.4 | DSZ | ROCKS ,SOIL,SLUDGE |
| 19.8 | TBD | Open 100% GREASE |
| 0 | AMH | 2:45AM |
| 8.3 | SSS | FIBOROUS OUTER SURFACE |
| 95.8 | MGO | ZOOM 26' |
| 121 | SSS | FIBOROUS BLISTERING OUTER SURFACE |