Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 19, 2014, 08:08 AM
  • B 0738_B 0737_20141119_003109.mp4

Date
11/19/2014
W/O
470341
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00111
PipeID
P09205
Time
12:08 AM
Certificate
03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1669
Sewer Name
B JOINT OUTFALL B - UNIT 8H
City
MONROVIA, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
01
Purpose
Routine Assessment
Project
WO_0470341_TV15139_2014OCTOBER
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
B 0738
Downstream MH
B 0737
Dir. of Survey
Downstream
Length Surveyed
147.8 ft.
Total Length
147.8 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
2
O&M Quick
2311
O&M Rating
7
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole B 0738 to B 0737
MH: B 0738MH: B 0737downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 738 (00:09)0 ft. MGO - General Observation - CONNECTION AT MANHOLE ACTIVE 9 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start8.1 ft. CM - Crack Multiple, from 12 to 09 o'clock, within 8 inches of joint: NO37.3 ft. DSGV - Deposits Settled Gravel, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO52.8 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start71 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Finish129.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES129.9 ft. RFJ - Roots Fine Joint, from 07 to 08 o'clock, within 8 inches of joint: YESR138 ft. CM - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES145.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish147.8 ft. MGO - General Observation - CONNECTION AT MANHOLE CAPPED 9 O'CLOCK147.8 ft. AMH - Downstream Manhole, Survey Ends - B 0737 (00:29)

Observation photos (12)

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • General Observation - CONNECTION AT MANHOLE ACTIVE 9 O'CLOCK

    0 ft. - General Observation - CONNECTION AT MANHOLE ACTIVE 9 O'CLOCK

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start

  • Crack Multiple, from 12 to 09 o'clock, within 8 inches of joint: NO

    8.1 ft. - Crack Multiple, from 12 to 09 o'clock, within 8 inches of joint: NO

  • Deposits Settled Gravel,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO

    37.3 ft. - Deposits Settled Gravel, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO

  • Deposits Settled Compacted,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO, Start

    52.8 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start

  • Deposits Settled Compacted,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO, Finish

    71 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Finish

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    129.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 07 to 08 o'clock, within 8 inches of joint: YESR

    129.9 ft. - Roots Fine Joint, from 07 to 08 o'clock, within 8 inches of joint: YESR

  • Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

    138 ft. - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO, Finish

    145.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish

  • General Observation - CONNECTION AT MANHOLE CAPPED 9 O'CLOCK

    147.8 ft. - General Observation - CONNECTION AT MANHOLE CAPPED 9 O'CLOCK

Observations (15)

DistanceCodeObservation
52.8DSC
8.1CM
129.7CM
129.9RFJ
0MWM
0MWL
71DSC
0AMHB 738 (00:09)
2DAGS
147.8MGOCONNECTION AT MANHOLE CAPPED 9 O'CLOCK
138CM
147.8AMHB 0737 (00:29)
0MGOCONNECTION AT MANHOLE ACTIVE 9 O'CLOCK
145.9DAGS
37.3DSGV

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2014-11-19T00:08:58-08:00
documentation
PRO-PIPE
is_lateral_inspection
false