B 0739_B 0738_20141119_005730.mp4
0 ft. - General Observation - CONNECTION AT MANHOLE ACTIVE 9 O'CLOCK
0 ft. - Water Mark, 20 %of cross sectional area
0 ft. - Water Level, 10 %of cross sectional area
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
92.9 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"
102.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN
151.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish
152.9 ft. - General Observation - CONNECTION AT MANHOLE ACTIVE 3 O'CLOCK
152.9 ft. - Upstream Manhole, Survey Ends - B 0739 (00:55)
| Distance | Code | Observation |
|---|---|---|
| 92.9 | TFC | — |
| 151.2 | DAGS | — |
| 102.9 | TB | OPEN |
| 0 | MGO | CONNECTION AT MANHOLE ACTIVE 9 O'CLOCK |
| 152.9 | MGO | CONNECTION AT MANHOLE ACTIVE 3 O'CLOCK |
| 0 | MWM | — |
| 152.9 | AMH | B 0739 (00:55) |
| 0 | AMH | B 0738 (00:44) |
| 0 | MWL | — |
| 2 | DAGS | — |