Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 14, 2014, 11:49 AM
  • 15 0020_15 0019_20141114_035830.mp4

Date
11/14/2014
W/O
470269
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00622
PipeID
P11909
Time
3:49 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1855
Sewer Name
15 PUENTE TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Routine Assessment
Project
WO_0470269_TV15026_2014OCTOBER_1
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
15 0020
Downstream MH
15 0019
Dir. of Survey
Downstream
Length Surveyed
155.3 ft.
Total Length
155.3 ft.
Structural Index
2
Structural Quick
3128
Structural Rating
19
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
2
Overall Quick
Overall Rating
81
Pipe schematic from manhole 15 0020 to 15 0019
MH: 15 0020MH: 15 0019downstream0 ft. MGO - General Observation - CONNECTION AT MANHOLE 3 O'CLOCK, ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 15 00200 ft. MGO - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK, ACTIVE0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 10 %of cross sectional area5.4 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES6 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start27 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish48.7 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start48.7 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"66.3 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish93.7 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"144.7 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"151.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish155.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0019

Observation photos (16)

  • General Observation - CONNECTION AT MANHOLE 3 O'CLOCK, ACTIVE

    0 ft. - General Observation - CONNECTION AT MANHOLE 3 O'CLOCK, ACTIVE

  • Upstream Manhole, Survey Begins - 15 0020

    0 ft. - Upstream Manhole, Survey Begins - 15 0020

  • General Observation - CONNECTION AT MANHOLE 9 O'CLOCK, ACTIVE

    0 ft. - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK, ACTIVE

  • Water Mark, 20 %of cross sectional area

    0 ft. - Water Mark, 20 %of cross sectional area

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

    5.4 ft. - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

    27 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    48.7 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    48.7 ft. - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

    66.3 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    93.7 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    144.7 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    151.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

  • Downstream Manhole, Survey Ends - 15 0019

    155.3 ft. - Downstream Manhole, Survey Ends - 15 0019

Observations (16)

DistanceCodeObservation
155.3AMH15 0019
0MGOCONNECTION AT MANHOLE 3 O'CLOCK, ACTIVE
0AMH15 0020
5.4CM
93.7TBA
27CL
48.7CL
66.3CL
0MGOCONNECTION AT MANHOLE 9 O'CLOCK, ACTIVE
48.7TBC
0MWM
0DAGS
6CL
0MWL
151.4DAGS
144.7TBA

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2014-11-14T03:49:11-08:00
documentation
PROPIPE
is_lateral_inspection
false