15 0013_15 0012_20141117_033822.mp4
0 ft. - Water Level, 10 %of cross sectional area
0 ft. - Water Mark, 20 %of cross sectional area
0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
0 ft. - Upstream Manhole, Survey Begins - 15 0013
0 ft. - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK
6.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
9.4 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
31.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
53.2 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE
71.6 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish
71.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish
75.9 ft. - Downstream Manhole, Survey Ends - 15 0012
| Distance | Code | Observation |
|---|---|---|
| 71.6 | DSGV | — |
| 53.2 | TF | ACTIVE |
| 31.5 | TFC | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 0 | DAGS | — |
| 71.6 | DAGS | — |
| 0 | AMH | 15 0013 |
| 9.4 | DSGV | — |
| 0 | MGO | CONNECTION AT MANHOLE 9 O'CLOCK |
| 6.1 | TFC | — |
| 75.9 | AMH | 15 0012 |