Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2014, 11:30 AM
  • 15 0013_15 0012_20141117_033822.mp4

Date
11/17/2014
W/O
470269
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00622
PipeID
P11901
Time
3:30 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1861
Sewer Name
15 PUENTE TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_0470269_TV15026_2014OCTOBER_1
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
15 0013
Downstream MH
15 0012
Dir. of Survey
Downstream
Length Surveyed
75.9 ft.
Total Length
75.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2D00
O&M Rating
52
Overall Index
2
Overall Quick
Overall Rating
52
Pipe schematic from manhole 15 0013 to 15 0012
MH: 15 0013MH: 15 0012downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. AMH - Upstream Manhole, Survey Begins - 15 00130 ft. MGO - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK6.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"9.4 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start31.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"53.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE71.6 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish71.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish75.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0012

Observation photos (12)

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • Water Mark, 20 %of cross sectional area

    0 ft. - Water Mark, 20 %of cross sectional area

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Upstream Manhole, Survey Begins - 15 0013

    0 ft. - Upstream Manhole, Survey Begins - 15 0013

  • General Observation - CONNECTION AT MANHOLE 9 O'CLOCK

    0 ft. - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    6.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    9.4 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    31.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE

    53.2 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Finish

    71.6 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    71.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

  • Downstream Manhole, Survey Ends - 15 0012

    75.9 ft. - Downstream Manhole, Survey Ends - 15 0012

Observations (12)

DistanceCodeObservation
71.6DSGV
53.2TFACTIVE
31.5TFC
0MWL
0MWM
0DAGS
71.6DAGS
0AMH15 0013
9.4DSGV
0MGOCONNECTION AT MANHOLE 9 O'CLOCK
6.1TFC
75.9AMH15 0012

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2014-11-17T03:30:10-08:00
documentation
PROPIPE
is_lateral_inspection
false