15 0013A_15 0013_20141117_032841.mp4
0 ft. - Upstream Manhole, Survey Begins - 15 0013A
0 ft. - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK
0 ft. - Water Level, 10 %of cross sectional area
0 ft. - Water Mark, 20 %of cross sectional area
46.5 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"
49.8 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
101.5 ft. - Deposits Settled Gravel, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
103.5 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
108.8 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"
150.2 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN
167.3 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
209.3 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
218.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
244.5 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"
252.9 ft. - Deposits Settled Gravel, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish
263.5 ft. - Downstream Manhole, Survey Ends - 15 0013
263.5 ft. - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 15 0013A |
| 209.3 | TFC | — |
| 46.5 | TFA | — |
| 263.5 | AMH | 15 0013 |
| 218.1 | TFC | — |
| 0 | MGO | CONNECTION AT MANHOLE 9 O'CLOCK |
| 0 | MWL | — |
| 108.8 | TB | — |
| 244.5 | TFA | — |
| 101.5 | DSGV | — |
| 103.5 | TFC | — |
| 150.2 | TF | OPEN |
| 0 | MWM | — |
| 167.3 | TFC | — |
| 252.9 | DSGV | — |
| 49.8 | TFC | — |
| 263.5 | MGO | CONNECTION AT MANHOLE 9 O'CLOCK |