Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2014, 10:26 AM
  • 15 0015_15 0014A_20141117_025956.mp4

Date
11/17/2014
W/O
470269
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00622
PipeID
P11904
Time
2:26 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1861
Sewer Name
15 PUENTE TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_0470269_TV15026_2014OCTOBER_1
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
15 0015
Downstream MH
15 0014A
Dir. of Survey
Downstream
Length Surveyed
375.4 ft.
Total Length
375.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2\00
O&M Rating
294
Overall Index
2
Overall Quick
Overall Rating
294
Pipe schematic from manhole 15 0015 to 15 0014A
MH: 15 0015MH: 15 0014Adownstream0 ft. MGO - General Observation - CAPPED CONNECTION AT MANHOLE 9 O'CLOCK0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. MGO - General Observation - CAPPED CONNECTION AT MANHOLE 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 00150 ft. MWL - Water Level, 10 %of cross sectional area25.3 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start43.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"93.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"139.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"189.5 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE237.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES240.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"288 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES339.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"373.5 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish373.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish375.4 ft. MGO - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK375.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0014A

Observation photos (19)

  • General Observation - CAPPED CONNECTION AT MANHOLE 9 O'CLOCK

    0 ft. - General Observation - CAPPED CONNECTION AT MANHOLE 9 O'CLOCK

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - CAPPED CONNECTION AT MANHOLE 3 O'CLOCK

    0 ft. - General Observation - CAPPED CONNECTION AT MANHOLE 3 O'CLOCK

  • Water Mark, 20 %of cross sectional area

    0 ft. - Water Mark, 20 %of cross sectional area

  • Upstream Manhole, Survey Begins - 15 0015

    0 ft. - Upstream Manhole, Survey Begins - 15 0015

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    25.3 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    43.2 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    93.8 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    139.6 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE

    189.5 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES

    237.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES

  • Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    240.8 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    288 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

  • Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    339.6 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Finish

    373.5 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    373.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

  • General Observation - CONNECTION AT MANHOLE 9 O'CLOCK

    375.4 ft. - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK

  • Downstream Manhole, Survey Ends - 15 0014A

    375.4 ft. - Downstream Manhole, Survey Ends - 15 0014A

Observations (19)

DistanceCodeObservation
375.4MGOCONNECTION AT MANHOLE 9 O'CLOCK
0MGOCAPPED CONNECTION AT MANHOLE 9 O'CLOCK
189.5TBACTIVE
288DAGS
0DAGS
139.6TFC
0MGOCAPPED CONNECTION AT MANHOLE 3 O'CLOCK
0MWM
0AMH15 0015
373.5DSGV
237.8DAGS
375.4AMH15 0014A
93.8TFC
25.3DSGV
373.5DAGS
0MWL
339.6TFA
240.8TFA
43.2TFC

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2014-11-17T02:26:11-08:00
documentation
PROPIPE
is_lateral_inspection
false