15 0035_15 0034_20141113_030240.mp4
0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
0 ft. - Water Mark, 20 %of cross sectional area
0 ft. - Upstream Manhole, Survey Begins - 15 0035
0 ft. - Water Level, 10 %of cross sectional area
7.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
27.2 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN
54.5 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"
78.2 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
105.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
129.5 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
152.8 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
176.8 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
204.8 ft. - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
231.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN
255.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
279.1 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
306.7 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
330 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
357.2 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
380.9 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
408.4 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
428.1 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
447.7 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
457 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish
458.2 ft. - Downstream Manhole, Survey Ends - 15 0034
| Distance | Code | Observation |
|---|---|---|
| 279.1 | TFC | — |
| 7.1 | TFC | — |
| 152.8 | TFC | — |
| 457 | DAGS | — |
| 176.8 | TFC | — |
| 447.7 | TFC | — |
| 0 | DAGS | — |
| 306.7 | TFC | — |
| 428.1 | TFC | — |
| 105.5 | TFC | — |
| 231.9 | TB | OPEN |
| 204.8 | TBC | — |
| 129.5 | TFC | — |
| 408.4 | TFC | — |
| 0 | MWM | — |
| 0 | AMH | 15 0035 |
| 27.2 | TB | OPEN |
| 330 | TFC | — |
| 357.2 | TFC | — |
| 458.2 | AMH | 15 0034 |
| 78.2 | TFC | — |
| 54.5 | TBA | — |
| 0 | MWL | — |
| 255.6 | TFC | — |
| 380.9 | TFC | — |