Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 14, 2014, 07:59 AM
  • 15 0028_15 0027_20141114_000422.mp4

Date
11/13/2014
W/O
470269
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00622
PipeID
P11918
Time
11:59 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1855
Sewer Name
15 PUENTE TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Routine Assessment
Project
WO_0470269_TV15026_2014OCTOBER_1
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
15 0028
Downstream MH
15 0027
Dir. of Survey
Downstream
Length Surveyed
15.3 ft.
Total Length
15.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 15 0028 to 15 0027
MH: 15 0028MH: 15 0027downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 00280 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area15.1 ft. MGO - General Observation - CONNECTION AT MANHOLE 3 O'CLOCK,ACTIVE15.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0027

Observation photos (5)

  • Upstream Manhole, Survey Begins - 15 0028

    0 ft. - Upstream Manhole, Survey Begins - 15 0028

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • Water Mark, 20 %of cross sectional area

    0 ft. - Water Mark, 20 %of cross sectional area

  • General Observation - CONNECTION AT MANHOLE 3 O'CLOCK,ACTIVE

    15.1 ft. - General Observation - CONNECTION AT MANHOLE 3 O'CLOCK,ACTIVE

  • Downstream Manhole, Survey Ends - 15 0027

    15.3 ft. - Downstream Manhole, Survey Ends - 15 0027

Observations (5)

DistanceCodeObservation
0AMH15 0028
15.3AMH15 0027
0MWL
15.1MGOCONNECTION AT MANHOLE 3 O'CLOCK,ACTIVE
0MWM

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2014-11-13T23:59:55-08:00
documentation
PROPIPE
is_lateral_inspection
false