Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2014, 11:07 AM
  • 15 0014_15 0013A_20141117_031536.mp4

Date
11/17/2014
W/O
470269
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00622
PipeID
P20531
Time
3:07 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1861
Sewer Name
15 PUENTE TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_0470269_TV15026_2014OCTOBER_1
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
15 0014
Downstream MH
15 0013A
Dir. of Survey
Downstream
Length Surveyed
117.1 ft.
Total Length
117.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2C00
O&M Rating
38
Overall Index
2
Overall Quick
Overall Rating
38
Pipe schematic from manhole 15 0014 to 15 0013A
MH: 15 0014MH: 15 0013Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 00140 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"36.5 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start44.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.7 ft. TFI - Tap Factory Made Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 5", 6", 6" - Open88.1 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN100 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN112.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish116.7 ft. MGO - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK, ACTIVE116.7 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish117.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0013A

Observation photos (15)

  • Upstream Manhole, Survey Begins - 15 0014

    0 ft. - Upstream Manhole, Survey Begins - 15 0014

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • Water Mark, 20 %of cross sectional area

    0 ft. - Water Mark, 20 %of cross sectional area

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    7.1 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    36.5 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    44.7 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 5", 6", 6" - Open

    54.7 ft. - Tap Factory Made Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 5", 6", 6" - Open

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    88.1 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    100 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    112.1 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    116.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

  • General Observation - CONNECTION AT MANHOLE 9 O'CLOCK, ACTIVE

    116.7 ft. - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK, ACTIVE

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Finish

    116.7 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

  • Downstream Manhole, Survey Ends - 15 0013A

    117.1 ft. - Downstream Manhole, Survey Ends - 15 0013A

Observations (15)

DistanceCodeObservation
116.7DAGS
0AMH15 0014
100TFOPEN
116.7MGOCONNECTION AT MANHOLE 9 O'CLOCK, ACTIVE
54.7TFIOpen
44.7TFC
7.1TFC
0MWL
88.1TBOPEN
0MWM
36.5DSGV
116.7DSGV
112.1TFC
0DAGS
117.1AMH15 0013A

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2014-11-17T03:07:25-08:00
documentation
PROPIPE
is_lateral_inspection
false