Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2014, 11:02 AM
  • 15 0032_15 0031_20141118_034801.mp4

Date
11/18/2014
W/O
470269
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00622
PipeID
P11922
Time
3:02 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1862
Sewer Name
15 PUENTE TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Routine Assessment
Project
WO_0470269_TV15026_2014OCTOBER_1
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
15 0032
Downstream MH
15 0031
Dir. of Survey
Downstream
Length Surveyed
48.1 ft.
Total Length
48.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 15 0032 to 15 0031
MH: 15 0032MH: 15 0031downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 00320 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CAPPED CONNECTION AT MANHOLE 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area20.2 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES28.6 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start48.1 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish48.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0031

Observation photos (8)

  • Upstream Manhole, Survey Begins - 15 0032

    0 ft. - Upstream Manhole, Survey Begins - 15 0032

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • General Observation - CAPPED CONNECTION AT MANHOLE 3 O'CLOCK

    0 ft. - General Observation - CAPPED CONNECTION AT MANHOLE 3 O'CLOCK

  • Water Mark, 20 %of cross sectional area

    0 ft. - Water Mark, 20 %of cross sectional area

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    20.2 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    28.6 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Finish

    48.1 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

  • Downstream Manhole, Survey Ends - 15 0031

    48.1 ft. - Downstream Manhole, Survey Ends - 15 0031

Observations (8)

DistanceCodeObservation
0AMH15 0032
0MWL
0MGOCAPPED CONNECTION AT MANHOLE 3 O'CLOCK
0MWM
20.2CM
48.1DSGV
28.6DSGV
48.1AMH15 0031

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2014-11-18T03:02:14-08:00
documentation
PROPIPE
is_lateral_inspection
false