15 0045_15 0044_20141110_025210.mp4
0 ft. - Water Level, 10 %of cross sectional area
0 ft. - Water Mark, 20 %of cross sectional area
0 ft. - Upstream Manhole, Survey Begins - 15 0045
2.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
7.4 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"
18.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
48.5 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
67.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
93.7 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"
116.7 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
128.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish
131.2 ft. - Downstream Manhole, Survey Ends - 15 0044
| Distance | Code | Observation |
|---|---|---|
| 18.1 | TFC | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 2.6 | DAGS | — |
| 93.7 | TF | — |
| 7.4 | TF | — |
| 0 | AMH | 15 0045 |
| 128.4 | DAGS | — |
| 48.5 | TFC | — |
| 116.7 | TFC | — |
| 131.2 | AMH | 15 0044 |
| 67.6 | TFC | — |