20 0622_20 0621_20141119_051730.mp4
0 ft. - Upstream Manhole, Survey Begins - 20 0622
0 ft. - Water Mark, 15 %of cross sectional area
0 ft. - Water Level, 10 %of cross sectional area
0 ft. - General Observation - ACTIVE CONNECTION AT MH 6 O'CLOCK
29.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, at 04 o'clock, , within 8 inches of joint: YES, Start
29.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, at 08 o'clock, , within 8 inches of joint: YES, Start
43.8 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"
288.9 ft. - Downstream Manhole, Survey Ends - 20 0621
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 20 0622 |
| 288.9 | DAGS | — |
| 0 | MWM | — |
| 288.9 | AMH | 20 0621 |
| 29.3 | DAGS | — |
| 288.9 | DAGS | — |
| 0 | MWL | — |
| 29.3 | DAGS | — |
| 0 | MGO | ACTIVE CONNECTION AT MH 6 O'CLOCK |
| 43.8 | TF | — |