Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 29, 2021, 07:40 AM
  • 08 0231_08 0230_07292021_005653.mp4

Date
07/29/2021
W/O
901971
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00005
PipeID
P00105
Time
12:40 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9203
Sewer Name
08 EAST ROAD TRUNK
City
WEST CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_901971_TV08112_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
12 in.
Upstream MH
08 0231
Downstream MH
08 0230
Dir. of Survey
Downstream
Length Surveyed
350.9 ft.
Total Length
350.9 ft.
Structural Index
4
Structural Quick
4H3D
Structural Rating
253
O&M Index
2
O&M Quick
412M
O&M Rating
142
Overall Index
3
Overall Quick
Overall Rating
395
Pipe schematic from manhole 08 0231 to 08 0230
MH: 08 0231MH: 08 0230downstream0 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 08 02310 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.9 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start75.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"77.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"119.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish119.3 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start134.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"239.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"335.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"348.7 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish348.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish350.9 ft. AMH - Downstream Manhole, Survey Ends - 08 0230350.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    119.3 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    350.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
335.6TFA
75.1TBA
348.7FM
350.9AMH08 0230
2DAGS
119.3CM
348.7DAGS
3.9CM
239.3TFA
350.9MGOCOCKROACHES IN MANHOLE
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
0AMH08 0231
0MWL
119.3FM
0MWM
77.8TFC
134.6TFA

Properties (7)

additional_info
630069072821203
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2021-07-29T00:40:01-07:00
documentation
PRO PIPE
is_lateral_inspection
false