Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2021, 01:55 PM
  • 29 0529A_29 0529_07282021_071432.mp4

Date
07/28/2021
W/O
901941
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01106
PipeID
P24584
Time
6:55 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9088
Sewer Name
29 19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_901941_TV29072_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0529
Downstream MH
29 0529A
Dir. of Survey
Upstream
Length Surveyed
249 ft.
Total Length
249 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
123
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
123
Pipe schematic from manhole 29 0529 to 29 0529A
MH: 29 0529MH: 29 0529Aupstream0 ft. ACOM - Cleanout Mainline, Survey Ends - 29 0529A0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"9.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"36.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"49.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"58.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"105.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"203.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start204.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"207.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"249 ft. MWL - Water Level, 5 %of cross sectional area249 ft. MWM - Water Mark, 5 %of cross sectional area249 ft. AMH - Downstream Manhole, Survey Begins - 29 0529

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    45.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    199.4 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    246.5 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (15)

DistanceCodeObservation
41.7TF
239.8TF
44.2TF
45.2CM
190.7TF
249ACOM29 0529A
246.5TB
143.3TF
0MWL
249CM
0MWM
212.3TF
98.7TF
0AMH29 0529
199.4TB

Properties (7)

additional_info
630070072821051
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-07-28T06:55:54-07:00
documentation
PROPIPE
is_lateral_inspection
false