Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2021, 03:07 PM
  • 29 0519A_29 0519_07282021_083245.mp4

Date
07/28/2021
W/O
901941
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01106
PipeID
P24571
Time
8:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9088
Sewer Name
29 19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_901941_TV29072_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0519
Downstream MH
29 0519A
Dir. of Survey
Upstream
Length Surveyed
290.8 ft.
Total Length
290.8 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
147
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
147
Pipe schematic from manhole 29 0519 to 29 0519A
MH: 29 0519MH: 29 0519Aupstream0 ft. ACOM - Cleanout Mainline, Survey Ends - 29 0519A2.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"4.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"22.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"40.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish40.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"46.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"150.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"205 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"210.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"249.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"251.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"272.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"285.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"287.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start290.8 ft. MWM - Water Mark, 5 %of cross sectional area290.8 ft. AMH - Downstream Manhole, Survey Begins - 29 0519290.8 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    17.9 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (21)

DistanceCodeObservation
288.7TF
244.7TFC
250.6TF
250.7CM
0MWM
193.3TFC
268TFC
17.9TB
140TF
286TFA
0AMH29 0519
80.1TF
41.3TFC
5.6TFC
3.6CM
0MWL
181.4TF
39.2TF
290.8ACOM29 0519A
142.6TF
85.8TF

Properties (7)

additional_info
630070072821051
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-07-28T08:07:48-07:00
documentation
PROPIPE
is_lateral_inspection
false