Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 3, 2014, 12:50 PM
  • 14 0755_14 0754_03112014_050640.mp4

Date
11/03/2014
W/O
0459312
Weather
Dry
Operator/Surveyor
C. DEHNER.
Sewer ID
Z00949
PipeID
P20635
Time
4:50 AM
Certificate
U-912-15963
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1629
Sewer Name
14 TRUNK "F" RELIEF, SECTION 2
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
10
Purpose
Routine Assessment
Project
WO_0459312_TV14052_2014October
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
14 0755
Downstream MH
14 0754
Dir. of Survey
Downstream
Length Surveyed
268.1 ft.
Total Length
268.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412J
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
110
Pipe schematic from manhole 14 0755 to 14 0754
MH: 14 0755MH: 14 0754downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 07550 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start264.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish268 ft. MGO - General Observation - Connec, @ Mh, 10 O' Clock. Open268.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0754

Observation photos (1)

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0AMH14 0755
268MGOConnec, @ Mh, 10 O' Clock. Open
268.1AMH14 0754
2DAGS
0MWL
264.6DAGS
0MWM

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2014-11-03T04:50:27-08:00
documentation
PRO-PIPE
is_lateral_inspection
false
year_laid
19921016