14 0586_14 0585_08122014_231121.mp4
0 ft. - Upstream Manhole, Survey Begins - 14 0586 (22:49)
0 ft. - Water Mark, 15 %of cross sectional area
0 ft. - Water Level, 10 %of cross sectional area
2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
156.8 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"
266.2 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
| Distance | Code | Observation |
|---|---|---|
| 330 | VC | >50 |
| 328.2 | DAGS | — |
| 2.1 | DAGS | — |
| 0 | AMH | 14 0586 (22:49) |
| 329.9 | MGO | CONNECTION AT MANHOLE ACTIVE 3 O'CLOCK |
| 0 | MWM | — |
| 0 | MWL | — |
| 266.2 | TBA | — |
| 330 | AMH | 14 0585 (23:10) |
| 156.8 | TFC | — |