Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2021, 06:20 AM
  • 22 1084_22 1083_07272021_235033.mp4

Date
07/27/2021
W/O
901759
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00812
PipeID
P17457
Time
11:20 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9105
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_901759_TV22043_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1084
Downstream MH
22 1083
Dir. of Survey
Downstream
Length Surveyed
351.2 ft.
Total Length
351.2 ft.
Structural Index
3
Structural Quick
413M
Structural Rating
211
O&M Index
2
O&M Quick
2B00
O&M Rating
32
Overall Index
3
Overall Quick
Overall Rating
243
Pipe schematic from manhole 22 1084 to 22 1083
MH: 22 1084MH: 22 1083downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10847.4 ft. CM - Crack Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES8.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"12 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start49.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"61.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"116.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"126.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"139 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"197.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"210.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"212.2 ft. FM - Fracture Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES268.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start284.8 ft. MGO - General Observation - UNMAPPED MH284.8 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK290.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"308 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"350.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish351.2 ft. AMH - Downstream Manhole, Survey Ends - 22 1083351.2 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK

Observation photos (8)

  • Crack Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES

    7.4 ft. - Crack Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    8.5 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    12 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    116.8 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    197.7 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Fracture Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES

    212.2 ft. - Fracture Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    268.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    308 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

Observations (23)

DistanceCodeObservation
284.8MGOUNMAPPED MH
290.5TF
139TFC
350.8CM
12CM
116.8TB
350.8DAGS
351.2AMH22 1083
212.2FM
7.4CM
197.7TB
0MWM
351.2MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
268.9DAGS
126.3TFC
308TB
284.8MGOCONNECTION AT MH, 3 O'CLOCK
49.2TFC
210.9TFC
0MWL
61.9TF
8.5TB
0AMH22 1084

Properties (7)

additional_info
630075072721202
custom_field_three
MULTIPLE FRACTURE, MULTIPLE CRACKS
custom_field_two
2
customer
1
datetime
2021-07-27T23:20:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false