Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2021, 10:16 AM
  • 22 1069_22 1068_07282021_032909.mp4

Date
07/28/2021
W/O
901759
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00812
PipeID
P17440
Time
3:16 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9105
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_901759_TV22043_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1068
Downstream MH
22 1069
Dir. of Survey
Upstream
Length Surveyed
229.8 ft.
Total Length
229.8 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
229
Pipe schematic from manhole 22 1068 to 22 1069
MH: 22 1068MH: 22 1069upstream0 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 22 10691 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish47.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"51.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"107.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"112 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - DEBRIS144.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"148.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"193.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"197.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"219.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"227.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start227.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start229.8 ft. MWM - Water Mark, 50 %of cross sectional area229.8 ft. MWL - Water Level, 15 %of cross sectional area229.8 ft. AMH - Downstream Manhole, Survey Begins - 22 1068229.8 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2SSS
32.5TF
182.7TF
0MWM
0MWL
0AMH22 1068
9.9TF
2SAP
117.8TFDEBRIS
122TF
228.8SSS
85.3TFC
81.1TF
229.8MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
178.7TFC
36.5TFC
229.8AMH22 1069
228.8SAP
0MGOCONNECTION AT MH, 9 O'CLOCK

Properties (7)

additional_info
630075072721202
custom_field_three
SPALLING, AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-07-28T03:16:44-07:00
documentation
PRO PIPE
is_lateral_inspection
false