Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 29, 2021, 08:12 AM
  • 22 1068_22 1067_07292021_013254.mp4

Date
07/29/2021
W/O
901759
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00812
PipeID
P17439
Time
1:12 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9106
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_901759_TV22043_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1068
Downstream MH
22 1067
Dir. of Survey
Downstream
Length Surveyed
298.7 ft.
Total Length
298.7 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
295
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
299
Pipe schematic from manhole 22 1068 to 22 1067
MH: 22 1068MH: 22 1067downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10680 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"54.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"62.6 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"71.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"71.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"76.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"87.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"119.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"168.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"172.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"192.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"241.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"277.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"296.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish296.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish298.7 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK298.7 ft. AMH - Downstream Manhole, Survey Ends - 22 1067

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

    62.6 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    71.9 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    76.5 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

Observations (23)

DistanceCodeObservation
54.8TFC
87.4TFC
76.5TB
192.7TFC
0MWM
298.7MGOCONNECTION AT MH, 9 O'CLOCK
71.2TFC
168.3TF
0MWL
241.2TFC
17.8TFC
2SAP
296.6SAP
172.4TF
0AMH22 1068
62.6TBA
0MGOCONNECTION AT MH, 3 O'CLOCK
296.6SSS
277.9TFC
71.9TBA
119.8TF
2SSS
298.7AMH22 1067

Properties (7)

additional_info
630075072821201
custom_field_three
SPALLING, AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-07-29T01:12:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false