Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 9, 2021, 07:42 AM
  • 02 1773_02 1772_892021_010605.mp4

Date
08/09/2021
W/O
0890811
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00271
PipeID
P04120
Time
12:42 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1906
Sewer Name
02 INDIANA STREET TRUNK
City
LOS ANGLES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
07A
Purpose
Routine Assessment
Project
20210805MDM_INDIANA_STREET_TRUNK
Material
NRCP
Shape
Circular
Height
7.570000171661377 in.
Upstream MH
02 1773
Downstream MH
02 1772
Dir. of Survey
Downstream
Length Surveyed
349.7 ft.
Total Length
349.7 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 02 1773 to 02 1772
MH: 02 1773MH: 02 1772downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:50AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - FIBEROUS BLISTERING9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open10.7 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - OUTER SUFACE CRACKING AND BECOMING FIBOROUS54.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open59.8 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - LES FIBOROUS EFFECT ON PIPE106.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open177.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open220.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open264.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open322.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open349.3 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish - FIBOROUS BLISTERING349.7 ft. AMH - Downstream Manhole, Survey Ends - 1:35AM

Observation photos (3)

  • Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - FIBEROUS BLISTERING

    2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - FIBEROUS BLISTERING

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open

    9 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open

  • Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - LES FIBOROUS EFFECT ON PIPE

    59.8 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - LES FIBOROUS EFFECT ON PIPE

Observations (15)

DistanceCodeObservation
0MWL
322.7TBOpen
177.3TBOpen
54.9TBOpen
349.7AMH1:35AM
0AMH12:50AM
106.1TBOpen
349.3SSSFIBOROUS BLISTERING
59.8SSSLES FIBOROUS EFFECT ON PIPE
2SSSFIBEROUS BLISTERING
9TBOpen
0MWM
10.7SSSOUTER SUFACE CRACKING AND BECOMING FIBOROUS
220.9TBOpen
264.8TBOpen

Properties (7)

custom_field_three
FIBOROUS OUTER SURFACE
custom_field_two
4
customer
LACSD
datetime
2021-08-09T00:42:24-07:00
documentation
MARTIN,REVELES,BARR,RAMERIZ
is_lateral_inspection
false
lining
CIPP