Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 4, 2021, 09:28 AM
  • 30 0041_30 0040_842021_025229.mp4

Date
08/04/2021
W/O
0896127
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00878
PipeID
P17744
Time
2:28 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1901
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
HERONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
20210804MDM_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
30 0041
Downstream MH
30 0040
Dir. of Survey
Downstream
Length Surveyed
315.7 ft.
Total Length
315.7 ft.
Structural Index
4
Structural Quick
5543
Structural Rating
39
O&M Index
3
O&M Quick
3321
O&M Rating
11
Overall Index
4
Overall Quick
Overall Rating
50
Pipe schematic from manhole 30 0041 to 30 0040
MH: 30 0041MH: 30 0040downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:40AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MAG COAT 80% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SRC - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR7 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG9.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - PEELED CONCRETE PIPE I UNDERE FLOW12.4 ft. SRC - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR17.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - PEELED CONCRETE PIPE22.6 ft. SRC - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: YES, - LONG REBAR28.4 ft. SRC - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR31.8 ft. SRC - Surface Reinforcement Corroded, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR36.8 ft. SAM - Surface Aggregate Missing, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG52.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - PEELED CONCRET UNDER FLOW68.5 ft. MGO - General Observation - MAG COAT 95% START172.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - PEELED CONCRETE UNDER FLOW280.5 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - PEELED PIPE UNDER FLOW301.7 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - PEELED CONCRETE PIPE UNDER FLOW315 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE315 ft. MGO - General Observation - MAG COAT 95% FINISH315 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG315.7 ft. AMH - Downstream Manhole, Survey Ends - 2:25AM

Observation photos (15)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 80% START

    2 ft. - General Observation - MAG COAT 80% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    2 ft. - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    7 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - PEELED CONCRETE PIPE I UNDERE FLOW

    9.9 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - PEELED CONCRETE PIPE I UNDERE FLOW

  • Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    12.4 ft. - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish - PEELED CONCRETE PIPE

    17.9 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - PEELED CONCRETE PIPE

  • Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: YES,  - LONG REBAR

    22.6 ft. - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: YES, - LONG REBAR

  • Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    28.4 ft. - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Reinforcement Corroded, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    31.8 ft. - Surface Reinforcement Corroded, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Aggregate Missing, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

    36.8 ft. - Surface Aggregate Missing, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO - PEELED CONCRET UNDER FLOW

    52.4 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - PEELED CONCRET UNDER FLOW

  • General Observation - MAG COAT 95% START

    68.5 ft. - General Observation - MAG COAT 95% START

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO - PEELED CONCRETE UNDER FLOW

    172.4 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - PEELED CONCRETE UNDER FLOW

Observations (24)

DistanceCodeObservation
52.4DSZPEELED CONCRET UNDER FLOW
0AMH2:40AM
28.4SRCCIRCUM REBAR
315.7AMH2:25AM
7SAMSEVERE AGG
301.7DSZPEELED CONCRETE PIPE UNDER FLOW
22.6SRCLONG REBAR
68.5MGOMAG COAT 95% START
17.9DSZPEELED CONCRETE PIPE
0MWM
9.9DSZPEELED CONCRETE PIPE I UNDERE FLOW
315SSSBLISTERING PEELING CONCRETE
2SAMSEVERE AGG
2MGOMAG COAT 80% START
315MGOMAG COAT 95% FINISH
36.8SAMSEVERE AGG
315SAMSEVERE AGG
2SSSBLISTERING PEELING CONCRETE
31.8SRCCIRCUM REBAR
280.5DSZPEELED PIPE UNDER FLOW
2SRCCIRCUM REBAR
0MWL
172.4DSZPEELED CONCRETE UNDER FLOW
12.4SRCCIRCUM REBAR

Properties (6)

custom_field_three
LONG & CIRCUM REBAR CORRODED- 80% MAG COAT
custom_field_two
2
customer
LACSD
datetime
2021-08-04T02:28:54-07:00
documentation
MARTIN,REVELES,OLIVER 111,RAMERIZ
is_lateral_inspection
false