Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 13, 2021, 04:43 AM
  • 18 0847_18 0846_07122021_221150.mp4

Date
07/12/2021
W/O
896356
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00709
PipeID
P14702
Time
9:43 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9071
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37A
Purpose
Routine Assessment
Project
WO_896356_TV18101_JUN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
18 0847
Downstream MH
18 0846
Dir. of Survey
Downstream
Length Surveyed
964.8 ft.
Total Length
964.8 ft.
Structural Index
3
Structural Quick
5L3e
Structural Rating
1285
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
1285
Pipe schematic from manhole 18 0847 to 18 0846
MH: 18 0847MH: 18 0846downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 08470 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. MGO - General Observation - MAG COAT2.5 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start329.7 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish964.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish964.8 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK964.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish964.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0846

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2.5SSS
329.7SRV
964.8SAP
2.5SAP
0AMH18 0847
2.5MGOMAG COAT
964.8MGOCONNECTION AT THE MH 3 OC'LOCK
0MWL
964.8SSS
2.5SRV
0MWM
964.8AMH18 0846

Properties (7)

additional_info
630074071221201
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-07-12T21:43:05-07:00
documentation
PRO PIPE
is_lateral_inspection
false