Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 29, 2021, 06:37 AM
  • 08 0141A_08 0141_07282021_235727.mp4

Date
07/28/2021
W/O
901758
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00006
PipeID
P00198
Time
11:37 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9202
Sewer Name
08 FIGUEROA STREET TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_901758_TV08002_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
8 in.
Upstream MH
08 0141A
Downstream MH
08 0141
Dir. of Survey
Downstream
Length Surveyed
229.6 ft.
Total Length
229.6 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
135
O&M Index
2
O&M Quick
2P00
O&M Rating
174
Overall Index
2
Overall Quick
Overall Rating
309
Pipe schematic from manhole 08 0141A to 08 0141
MH: 08 0141AMH: 08 0141downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 0141A0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start16.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start58 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"227.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish227.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish227.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish229.6 ft. AMH - Downstream Manhole, Survey Ends - 08 0141

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    16.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
58TFC
2SAP
157.7TFC
229.6AMH08 0141
16.1DAE
227.7DAGS
2DAGS
227.7SAP
0MWM
0AMH08 0141A
0MWL
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
227.7DAE

Properties (7)

additional_info
630069072821202
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-07-28T23:37:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false