Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 2, 2015, 11:11 AM
  • H 0233_H 0593_20151002_032721.mp4

Date
10/02/2015
W/O
521014
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00171
PipeID
P10652
Time
4:11 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2694
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
VERNON
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
16
Purpose
Routine Assessment
Project
WO_521014_TV02170_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
H 0233
Downstream MH
H 0593
Dir. of Survey
Downstream
Length Surveyed
230.8 ft.
Total Length
230.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole H 0233 to H 0593
MH: H 0233MH: H 0593downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 02332 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start11 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"60.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"109.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"210.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"230.8 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 5 O'CLOCK230.8 ft. AMH - Downstream Manhole, Survey Ends - H 0593230.8 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish230.8 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 11 O'CLOCK

Observation photos (1)

  • Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
230.8MGOACTIVE CONNECTION AT MH 5 O'CLOCK
0MWM
230.8AMHH 0593
210.7TFC
60.9TBA
0MWL
11TFC
0AMHH 0233
230.8DAGS
2DAGS
230.8MGOACTIVE CONNECTION AT MH 11 O'CLOCK
109.3TFC

Properties (6)

additional_info
SC203917
custom_field_two
4
customer
LACSD
datetime
2015-10-02T04:11:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false