Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 13, 2015, 09:43 AM
  • H 0236A_H 0236_20151013_020721.mp4

Date
10/13/2015
W/O
521014
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00171
PipeID
P17662
Time
2:43 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2705
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
VERNON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
16
Purpose
Routine Assessment
Project
WO_521014_TV02170_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
H 0236A
Downstream MH
H 0236
Dir. of Survey
Downstream
Length Surveyed
25 ft.
Total Length
25 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4131
O&M Rating
7
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole H 0236A to H 0236
MH: H 0236AMH: H 0236downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 0236A0 ft. MGO - General Observation - CONNECTION AT MH 4 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start25 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish25 ft. MSA - Survey Abandoned - DUE TO GREASE DEPOSITS.

Observation photos (1)

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
25DAGS
25MSADUE TO GREASE DEPOSITS.
2DAGS
0MWL
0AMHH 0236A
0MGOCONNECTION AT MH 4 O'CLOCK
0MWM

Properties (6)

additional_info
SC203928
custom_field_two
5
customer
LACSD
datetime
2015-10-13T02:43:29-07:00
documentation
PRO PIPE
is_lateral_inspection
false