Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 2, 2015, 08:05 AM
  • H 0226_H 0225_20151002_001935.mp4

Date
10/02/2015
W/O
501014
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00171
PipeID
P10643
Time
1:05 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2694
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
BELL
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
17
Purpose
Routine Assessment
Project
WO_521014_TV02170_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
H 0225
Downstream MH
H 0226
Dir. of Survey
Upstream
Length Surveyed
328.4 ft.
Total Length
328.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole H 0225 to H 0226
MH: H 0225MH: H 0226upstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - H 02260 ft. MGO - General Observation - ROACHES IN MH32.5 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 8", 1"85.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"188.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"290.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"319.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start326.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start328.4 ft. MWL - Water Level, 10 %of cross sectional area328.4 ft. MWM - Water Mark, 20 %of cross sectional area328.4 ft. AMH - Downstream Manhole, Survey Begins - H 0225

Observation photos (2)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 8", 1"

    295.9 ft. - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 8", 1"

Observations (14)

DistanceCodeObservation
328.4MGOACTIVE CONNECTION AT MH 9 O'CLOCK
139.6TFC
328.4CM
0MWL
328.4DAGS
328.4AMHH 0226
2DAGS
295.9TBI
328.4MGOROACHES IN MH
0MWM
243.1TFC
37.9TFC
0AMHH 0225
9.2CM

Properties (6)

additional_info
SC203917
custom_field_two
3
customer
LACSD
datetime
2015-10-02T01:05:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false