Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 2, 2015, 06:39 AM
  • H 0227_H 0226_20151001_225511.mp4

Date
10/01/2015
W/O
501014
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00171
PipeID
P10644
Time
11:39 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2694
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
BELL
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
17
Purpose
Routine Assessment
Project
WO_521014_TV02170_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
H 0227
Downstream MH
H 0226
Dir. of Survey
Downstream
Length Surveyed
335 ft.
Total Length
335 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole H 0227 to H 0226
MH: H 0227MH: H 0226downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 02270 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"122.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"220.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"315 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"329.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES333.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish335 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK335 ft. AMH - Downstream Manhole, Survey Ends - H 0226

Observation photos (2)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock,  , within 8 inches of joint: YES

    329.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
0AMHH 0227
335MGOCONNECTION AT MH 3 O'CLOCK
329.2DAE
5.2CM
0MWM
0MWL
333.1CM
122.4TFC
2DAGS
21.5TFC
220.3TFC
0MGOCONNECTION AT MH 3 O'CLOCK
333.1DAGS
315TFC
335AMHH 0226

Properties (6)

additional_info
SC203917
custom_field_two
3
customer
LACSD
datetime
2015-10-01T23:39:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false