Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 30, 2015, 06:58 AM
  • H 0232_H 0231A_20150929_231609.mp4

Date
09/29/2015
W/O
521014
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00171
PipeID
P10650
Time
11:58 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2692
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
VERNON
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
16
Purpose
Routine Assessment
Project
WO_521014_TV02170_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
H 0232
Downstream MH
H 0231A
Dir. of Survey
Downstream
Length Surveyed
332.3 ft.
Total Length
332.3 ft.
Structural Index
3
Structural Quick
3A00
Structural Rating
30
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
38
Pipe schematic from manhole H 0232 to H 0231A
MH: H 0232MH: H 0231Adownstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 02320 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start7.9 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES32.1 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES82.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish82.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"182.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"215.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES279.2 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES284.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"298.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start330.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish330.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish332.3 ft. MGO - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK332.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE332.3 ft. AMH - Downstream Manhole, Survey Ends - H 0231A332.3 ft. MGO - General Observation - CAPPED CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    215.6 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (21)

DistanceCodeObservation
32.1CM
284.3TFC
330.4DAGS
332.3MGOCAPPED CONNECTION AT MH 9 O'CLOCK
298.6CM
2DAGS
82.3DSZ
182.7TFC
215.6CM
330.4CM
0MWM
2DSZ
332.3MGOCOCKROACHES IN MANHOLE
332.3AMHH 0231A
332.3MGOCAPPED CONNECTION AT MH 3 O'CLOCK
0MWL
7.9CM
82.3TFC
0AMHH 0232
0MGOCOCKROACHES IN MANHOLE
279.2CM

Properties (6)

additional_info
SC203915
custom_field_two
3
customer
LACSD
datetime
2015-09-29T23:58:52-07:00
documentation
PRO PIPE
is_lateral_inspection
false