Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 19, 2021, 11:33 AM
  • 15 0463_15 0462_07192021_044857.mp4

Date
07/19/2021
W/O
901239
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00629
PipeID
P12388
Time
4:33 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9037
Sewer Name
15 SANTA ANITA OUTFALL TRUNK
City
ROSEMEAD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_901239_TV15144_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0463
Downstream MH
15 0462
Dir. of Survey
Downstream
Length Surveyed
427.8 ft.
Total Length
427.8 ft.
Structural Index
3
Structural Quick
3L25
Structural Rating
205
O&M Index
2
O&M Quick
2P00
O&M Rating
170
Overall Index
2
Overall Quick
Overall Rating
375
Pipe schematic from manhole 15 0463 to 15 0462
MH: 15 0463MH: 15 0462downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 15 04632 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start17.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES50.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES58 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES425 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish425.9 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish425.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish427.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0462

Observation photos (6)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    17.5 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    50.9 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    58 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
58CL
425.9CM
17.5CL
425SSS
0MWL
427.8AMH15 0462
425.9DAGS
50.9CL
2SSS
0MWM
2CM
2DAGS
0MGOROACHES @ MH
0AMH15 0463

Properties (7)

additional_info
630069071921001
custom_field_three
MULTIPLE CRACKS
custom_field_two
2
customer
1
datetime
2021-07-19T04:33:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false