Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 16, 2021, 06:06 AM
  • 15 0588_15 0587_07152021_231519.mp4

Date
07/15/2021
W/O
901255
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00613
PipeID
P12518
Time
11:06 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9033
Sewer Name
15 LOWER AZUSA ROAD TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_901255_TV15234_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0588
Downstream MH
15 0587
Dir. of Survey
Downstream
Length Surveyed
230.6 ft.
Total Length
230.6 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
2
O&M Quick
2H00
O&M Rating
90
Overall Index
2
Overall Quick
Overall Rating
315
Pipe schematic from manhole 15 0588 to 15 0587
MH: 15 0588MH: 15 0587downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 15 05880 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.6 ft. MGO - General Observation - 70% MAG COATING3.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start25.8 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6" - OPEN61.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"154.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"228 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish228.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish228.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish230.6 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE230.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0587230.6 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 70% MAG COATING

    3.6 ft. - General Observation - 70% MAG COATING

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    230.6 ft. - General Observation - ROACHES @ MH

Observations (19)

DistanceCodeObservation
0MGOROACHES @ MH
3.6MGO70% MAG COATING
230.6MGOCONN @ MH 9 O'CLOCK/ACTIVE
3.6SAV
228.5SAV
230.6AMH15 0587
228.5DAGS
154.9TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
228SSS
25.8TBOPEN
2DAGS
230.6MGOROACHES @ MH
0AMH15 0588
0MWL
2SSS
0MWM
61.2TFC
190.8TFC

Properties (7)

additional_info
630069071521201
custom_field_three
VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2021-07-15T23:06:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false