Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 16, 2021, 06:15 AM
  • 15 0587_15 0586_07152021_232937.mp4

Date
07/15/2021
W/O
901255
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00613
PipeID
P12517
Time
11:15 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9033
Sewer Name
15 LOWER AZUSA ROAD TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_901255_TV15234_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0587
Downstream MH
15 0586
Dir. of Survey
Downstream
Length Surveyed
418.7 ft.
Total Length
418.7 ft.
Structural Index
3
Structural Quick
3O2P
Structural Rating
412
O&M Index
2
O&M Quick
2P00
O&M Rating
166
Overall Index
2
Overall Quick
Overall Rating
578
Pipe schematic from manhole 15 0587 to 15 0586
MH: 15 0587MH: 15 0586downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 15 05870 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"137.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"201 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.6 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN228.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"279.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN357.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"363.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"408.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"416 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish416 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish416 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish418.7 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE418.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0586418.7 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • General Observation - 65% MAG COAT

    2 ft. - General Observation - 65% MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    418.7 ft. - General Observation - ROACHES @ MH

Observations (24)

DistanceCodeObservation
0MGOROACHES @ MH
416SSS
0AMH15 0587
2MGO65% MAG COAT
416SAP
27.5TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
228.1TFC
279.5TBOPEN
416DAGS
0MWM
137.9TFC
2DAGS
201TFC
418.7MGOCONN @ MH 9 O'CLOCK/ACTIVE
204.6TBOPEN
408.9TFC
2SSS
418.7AMH15 0586
357.7TFC
418.7MGOROACHES @ MH
4.3SAP
363.7TFC
0MWL

Properties (7)

additional_info
630069071521201
custom_field_three
VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2021-07-15T23:15:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false