Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 16, 2021, 06:41 AM
  • 15 0585_15 0584_07152021_235059.mp4

Date
07/15/2021
W/O
901255
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00613
PipeID
P12515
Time
11:41 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9033
Sewer Name
15 LOWER AZUSA ROAD TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_901255_TV15234_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0585
Downstream MH
15 0584
Dir. of Survey
Downstream
Length Surveyed
265.6 ft.
Total Length
265.6 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
2
O&M Quick
2I00
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
364
Pipe schematic from manhole 15 0585 to 15 0584
MH: 15 0585MH: 15 0584downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 15 05852 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start48.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN114.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"126.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN151.9 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN192.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"263 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish263 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish263.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish265.6 ft. MGO - General Observation - ROACHES @ MH265.6 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE265.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0584

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • General Observation - 65% MAG COAT

    2 ft. - General Observation - 65% MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    265.6 ft. - General Observation - ROACHES @ MH

Observations (20)

DistanceCodeObservation
0MWM
2SSS
263SSS
126.4TFOPEN
192.1TFC
0MGOROACHES @ MH
265.6MGOROACHES @ MH
114.3TFC
0MWL
2MGO65% MAG COAT
263.2SAP
151.9TBOPEN
4SAP
263DAGS
265.6MGOCONN @ MH 9 O'CLOCK/ACTIVE
265.6AMH15 0584
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
48.5TFOPEN
0AMH15 0585
2DAGS

Properties (7)

additional_info
630069071521201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-07-15T23:41:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false