Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 16, 2021, 07:33 AM
  • 15 0582A_15 0582_07162021_004054.mp4

Date
07/16/2021
W/O
901255
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00613
PipeID
P12512
Time
12:33 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9033
Sewer Name
15 LOWER AZUSA ROAD TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_901255_TV15234_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0582A
Downstream MH
15 0582
Dir. of Survey
Downstream
Length Surveyed
214.3 ft.
Total Length
214.3 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
210
O&M Index
2
O&M Quick
2G00
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
294
Pipe schematic from manhole 15 0582A to 15 0582
MH: 15 0582AMH: 15 0582downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 0582A0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. MGO - General Observation - 60% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start56 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"71.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"211.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish212 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish212 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish214.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE214.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0582214.3 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • General Observation - 60% MAG COAT

    2 ft. - General Observation - 60% MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    214.3 ft. - General Observation - ROACHES @ MH

Observations (17)

DistanceCodeObservation
0AMH15 0582A
0MWL
2MGO60% MAG COAT
2DAGS
2SAP
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
214.3MGOCONN @ MH 9 O'CLOCK/ACTIVE
212SSS
214.3AMH15 0582
0MWM
71.3TFC
56TFC
211.5SAP
0MGOROACHES @ MH
2SSS
212DAGS
214.3MGOROACHES @ MH

Properties (7)

additional_info
630069071521201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-07-16T00:33:19-07:00
documentation
PRO PIPE
is_lateral_inspection
false