Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 21, 2021, 09:40 AM
  • B 0355_B 0354_07212021_025603.mp4

Date
07/21/2021
W/O
901610
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08867
Time
2:40 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9040
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
WO_901610_TV15051_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0355
Downstream MH
B 0354
Dir. of Survey
Downstream
Length Surveyed
381.1 ft.
Total Length
381.1 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
370
O&M Index
2
O&M Quick
412N
O&M Rating
154
Overall Index
2
Overall Quick
Overall Rating
524
Pipe schematic from manhole B 0355 to B 0354
MH: B 0355MH: B 0354downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03550 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start7.4 ft. MGO - General Observation - MAG COATING THROUGHOUT7.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start61.9 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"115.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"378.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish378.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish378.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE378.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish381.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK381.1 ft. AMH - Downstream Manhole, Survey Ends - B 0354

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    7.4 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    378.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
378.9SSS
61.9TBA
378.9DAGS
7.4MGOMAG COATING THROUGHOUT
0MGOCOCKROACHES IN MANHOLE
378.9MGOCOCKROACHES IN MANHOLE
0MWL
381.1MGOCONNECTION AT MH 3 O'CLOCK
7.4SSS
7.4SAP
0AMHB 0355
115.5TB
381.1AMHB 0354
0MWM
0MGOCONNECTION AT MH 3 O'CLOCK
2DAGS
378.9SAP

Properties (7)

additional_info
630069072021202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-07-21T02:40:36-07:00
documentation
PRO PIPE
is_lateral_inspection
false