Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2021, 07:00 AM
  • B 0348_B 0347_07222021_001120.mp4

Date
07/22/2021
W/O
901610
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08860
Time
12:00 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9042
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
WO_901610_TV15051_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
78 in.
Upstream MH
B 0348
Downstream MH
B 0347
Dir. of Survey
Downstream
Length Surveyed
204.3 ft.
Total Length
204.3 ft.
Structural Index
2
Structural Quick
322G
Structural Rating
86
O&M Index
2
O&M Quick
412D
O&M Rating
58
Overall Index
2
Overall Quick
Overall Rating
144
Pipe schematic from manhole B 0348 to B 0347
MH: B 0348MH: B 0347downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03480 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - MAG COATING THROUGHOUT66.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start192.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"193.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start202.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish202.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish202.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish204.3 ft. AMH - Downstream Manhole, Survey Ends - B 0347204.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK204.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2.6 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    66.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    193.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    204.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
0MGOCOCKROACHES IN MANHOLE
204.3AMHB 0347
2SSS
193.9SAP
202.1SSS
202.1SAP
0MWL
204.3MGOCONNECTION AT MH 3 O'CLOCK
66.3DAGS
0AMHB 0348
192.8TFA
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK
2.6MGOMAG COATING THROUGHOUT
202.1DAGS
204.3MGOCOCKROACHES IN MANHOLE

Properties (7)

additional_info
630069072121201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-07-22T00:00:02-07:00
documentation
PRO PIPE
is_lateral_inspection
false