Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 20, 2021, 05:38 AM
  • B 0371_B 0370_07192021_225146.mp4

Date
07/19/2021
W/O
901610
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08883
Time
10:38 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9038
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_901610_TV15051_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0371
Downstream MH
B 0370
Dir. of Survey
Downstream
Length Surveyed
330.6 ft.
Total Length
330.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
315
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
319
Pipe schematic from manhole B 0371 to B 0370
MH: B 0371MH: B 0370downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03712 ft. MGO - General Observation - MAG COATING THROUGHOUT11.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start328.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish328.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE328.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish330.6 ft. AMH - Downstream Manhole, Survey Ends - B 0370330.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    11.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    11.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    328.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (12)

DistanceCodeObservation
2MGOMAG COATING THROUGHOUT
328.3SAP
330.6AMHB 0370
330.6MGOCONNECTION AT MH 3 O'CLOCK
11.8SAP
0MWM
0MGOCOCKROACHES IN MANHOLE
0MWL
328.3MGOCOCKROACHES IN MANHOLE
11.8SSS
0AMHB 0371
328.3SSS

Properties (7)

additional_info
630069071921201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-07-19T22:38:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false