Wastewater/Activity/PacpInspection/1.0Jul 20, 2021, 07:09 AM
  • B 0368_B 0367_07202021_001834.mp4

Date
07/20/2021
W/O
901610
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08880
Time
12:09 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9038
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_901610_TV15051_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0368
Downstream MH
B 0367
Dir. of Survey
Downstream
Length Surveyed
242.6 ft.
Total Length
242.6 ft.
Structural Index
2
Structural Quick
3G2H
Structural Rating
211
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
215
Pipe schematic from manhole B 0368 to B 0367
MH: B 0368MH: B 0367downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03680 ft. MWL - Water Level, 40 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT4.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start44.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start108.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"239.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish239.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish241 ft. MGO - General Observation - COCKROACHES IN MANHOLE242.6 ft. AMH - Downstream Manhole, Survey Ends - B 0367242.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (4)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    44.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    241 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (12)

DistanceCodeObservation
0MWM
4.6SSS
242.6AMHB 0367
44.6SAP
239.5SAP
239.5SSS
241MGOCOCKROACHES IN MANHOLE
0AMHB 0368
0MWL
108.2TBA
242.6MGOCONNECTION AT MH 3 O'CLOCK
2MGOMAG COATING THROUGHOUT

Properties (7)

additional_info
630069071921201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-07-20T00:09:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false