Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 20, 2021, 08:50 AM
  • B 0362_B 0361_07202021_015845.mp4

Date
07/20/2021
W/O
901610
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08874
Time
1:50 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9038
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_901610_TV15051_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0362
Downstream MH
B 0361
Dir. of Survey
Downstream
Length Surveyed
256.5 ft.
Total Length
256.5 ft.
Structural Index
2
Structural Quick
3H2I
Structural Rating
241
O&M Index
2
O&M Quick
412I
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
345
Pipe schematic from manhole B 0362 to B 0361
MH: B 0362MH: B 0361downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 03620 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT4.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start19 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start254.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish254.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE254.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish254.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish256.5 ft. AMH - Downstream Manhole, Survey Ends - B 0361

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    19 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    254.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
254.3SAP
0AMHB 0362
2DAGS
256.5AMHB 0361
254.3MGOCOCKROACHES IN MANHOLE
0MWL
254.3SSS
254.3DAGS
2MGOMAG COATING THROUGHOUT
4.1SSS
19SAP
0MWM
0MGOCOCKROACHES IN MANHOLE

Properties (7)

additional_info
630069071921201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-07-20T01:50:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false