Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 20, 2021, 09:50 AM
  • B 0359_B 0358_07202021_030508.mp4

Date
07/20/2021
W/O
901610
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08871
Time
2:50 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9038
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_901610_TV15051_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0359
Downstream MH
B 0358
Dir. of Survey
Downstream
Length Surveyed
348.2 ft.
Total Length
348.2 ft.
Structural Index
2
Structural Quick
3K2L
Structural Rating
305
O&M Index
2
O&M Quick
412M
O&M Rating
143
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole B 0359 to B 0358
MH: B 0359MH: B 0358downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03590 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT26.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start49.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start130.4 ft. RFJ - Roots Fine Joint, at 09 o'clock, within 8 inches of joint: YESR345.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish345.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish345.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE345.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish348.2 ft. AMH - Downstream Manhole, Survey Ends - B 0358

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    26.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    49.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, at 09 o'clock, within 8 inches of joint: YESR

    130.4 ft. - Roots Fine Joint, at 09 o'clock, within 8 inches of joint: YESR

  • General Observation - COCKROACHES IN MANHOLE

    345.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
345.7SAP
49.3SAP
345.7DAGS
0MGOCOCKROACHES IN MANHOLE
0MWL
0AMHB 0359
130.4RFJ
345.7MGOCOCKROACHES IN MANHOLE
345.7SSS
0MWM
348.2AMHB 0358
2DAGS
2MGOMAG COATING THROUGHOUT
26.8SSS

Properties (7)

additional_info
630069071921201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-07-20T02:50:53-07:00
documentation
PRO PIPE
is_lateral_inspection
false