Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 30, 2021, 06:07 AM
  • 22 1051_22 1050_07292021_232453.mp4

Date
07/29/2021
W/O
901263
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00812
PipeID
P17422
Time
11:07 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9107
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
VINCENT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Routine Assessment
Project
WO_901263_TV22090_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1050
Downstream MH
22 1051
Dir. of Survey
Upstream
Length Surveyed
359.5 ft.
Total Length
359.5 ft.
Structural Index
2
Structural Quick
2M00
Structural Rating
142
O&M Index
2
O&M Quick
2M00
O&M Rating
144
Overall Index
2
Overall Quick
Overall Rating
286
Pipe schematic from manhole 22 1050 to 22 1051
MH: 22 1050MH: 22 1051upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 10510.5 ft. MGO - General Observation - ROACHES @ MH2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN63.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN96.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"150.4 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OFFSET CONN/OPEN209.1 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN214.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"262.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"305.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"357.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start357.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start359.5 ft. MWL - Water Level, 10 %of cross sectional area359.5 ft. MWM - Water Mark, 15 %of cross sectional area359.5 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE359.5 ft. MGO - General Observation - ROACHES @ MH359.5 ft. AMH - Downstream Manhole, Survey Begins - 22 1050

Observation photos (1)

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

    150.4 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

Observations (19)

DistanceCodeObservation
150.4TBOPEN
97.1TFC
145.4TFC
0MWL
0MWM
2DAGS
357SSS
53.6TFC
359.5AMH22 1051
262.6TFC
2SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
295.8TFOPEN
0MGOROACHES @ MH
359MGOROACHES @ MH
0AMH22 1050
357DAGS
209.1TFDOFFSET CONN/OPEN
351.5TFOPEN

Properties (7)

additional_info
630075072921201
custom_field_three
NO STRUCTURAL DEFECTS
custom_field_two
3
customer
1
datetime
2021-07-29T23:07:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false