Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 2, 2021, 08:06 AM
  • 01 0033_01 1319_822021_051223.mp4

Date
08/02/2021
W/O
0896107
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00209
PipeID
P01618
Time
1:06 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1890
Sewer Name
01 HOOPER AVENUE-COMPTON CREEK TRUNK
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
20210802MDM_HOOPER_AVENUE_COMPTON_CREEK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
25.700000762939453 in.
Upstream MH
01 0033
Downstream MH
01 1319
Dir. of Survey
Downstream
Length Surveyed
120.6 ft.
Total Length
120.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4131
O&M Rating
13
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 01 0033 to 01 1319
MH: 01 0033MH: 01 1319downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MGO - General Observation - Conn. @ Mh, 8 O' Clock. Active0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:05AM4.9 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: NO8 ft. MGO - General Observation - 25.4" VCP-CIPP15.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE DEBRIE50.3 ft. MGO - General Observation - CIPP LINER65.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE DEBRIE100.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - SLUDGE DEBRIE120.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: NO120.6 ft. AMH - Downstream Manhole, Survey Ends - 5:25AM

Observation photos (3)

  • Deposits Attached Grease, 15 %of cross sectional area, from 02 to 04 o'clock,  , within 8 inches of joint: NO

    4.9 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: NO

  • General Observation - 25.4" VCP-CIPP

    8 ft. - General Observation - 25.4" VCP-CIPP

  • General Observation - CIPP LINER

    50.3 ft. - General Observation - CIPP LINER

Observations (13)

DistanceCodeObservation
0MWM
0MGOConn. @ Mh, 9 O' Clock. Active
50.3MGOCIPP LINER
0MGOConn. @ Mh, 8 O' Clock. Active
100.9DSZSLUDGE DEBRIE
0MWL
120.6DAGS
8MGO25.4" VCP-CIPP
65.4DSZSLUDGE DEBRIE
15.5DSZSLUDGE DEBRIE
0AMH5:05AM
4.9DAGS
120.6AMH5:25AM

Properties (7)

custom_field_three
CIPP LINER GOOD CONDITION
custom_field_two
4
customer
LACSD
datetime
2021-08-02T01:06:08-07:00
documentation
MARTIN,BARR,RAMERIZ
is_lateral_inspection
false
lining
CIPP